5.8 Grounding the Generator
See Graphic: wc_gr000544
A ground connection (a) is located on the generator frame. For proper
operating safety, this ground terminal must be connected to a good
ground source. This ground connection must comply with National
Electrical Code standards, and state and local regulations.
5.9 Operating Heavy Loads
Limit operations requiring the maximum rated output of 6600 W to 20–
30 minutes. For continuous operation do not exceed the continuous
rated output of 6000 W (CAN models = 5500 W).
NOTICE: DO NOT exceed the current limit specified on the control
panel for any receptacle.