Wacker Neuson CRT 48-31V Instrukcja Operatora Strona 25

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 58
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 24
CRT 36 Operation
wc_tx000639gb.fm 25
3.4 Break-in Period
See Graphic: wc_gr001252
3.4.1 To break in the gearboxes, run the engine at 50% of full throttle for the
first 2–4 hours. This will prevent premature wear and extend gear life.
NOTICE: Running the engine at full throttle during the break-in period
could result in premature gear failure.
3.4.2 Verify that the horizontal blade pitch links are properly assembled.
When seated on the machine, the right rotor should have an “R”
designation located towards the upper portion of the pitch link and the
left rotor should have an “L”.
3.5 Before Starting
Before starting the trowel, check the following:
fuel level
oil level in the engine
condition of the air filter
condition of trowel arms and blades
Grease the trowel arms daily.
Przeglądanie stron 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 57 58

Komentarze do niniejszej Instrukcji

Brak uwag