Wacker Neuson BH 24 Instrukcja Operatora Strona 15

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 30
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 14
SV00044GB.fm 15
Safety instructions
2.2.15 The tank lid must fit tightly. Shut fuel cock if available when stopping
the engine. For long distance transports of machines operated by fuel
of fuel-mixtures, the fuel tank has to be drained competely.
Leaky fuel tanks may cause explosions and must therefore be
replaced immediately.
2.2.16 Stop engine before filling fuel tank. When refilling fuel tank, do not
allow fuel to come into contact with the hot parts of the engine or spill
onto the ground.
2.2.17 Make sure that sufficient fresh air is available when operating drilling
and breaking hammers with combustion engines in enclosed areas,
tunnels, adits, or deep trenches. For this particular use we offer
electrically driven drilling and breaking hammers.
2.2.18 Do not operate this machine in areas where explosions may occur.
2.3 Safety checks
2.3.1 Drilling and breaking hammers may only be operated with all safety
devices installed.
2.3.2 Before starting operation, the operator has to check that all control and
safety devices function properly.
2.3.3 Before starting operation, the overload clutch of drilling hammers has
to be checked for proper functioning.
2.3.4 In case of defects of the safety devices or other defects reducing the
operational safety of the drilling and breaking hammers, the supervisor
has to be informed immediately.
2.3.5 The machine must to be switched off immediately in case of defects
jeopardizing the operational safety of the equipment.
Przeglądanie stron 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 29 30

Komentarze do niniejszej Instrukcji

Brak uwag